Foundation rubble work is done in an area where there was a pond.We filled up the land and then after set out excavated filled up soil and started building rubble work for foundation from original soil level.After dry pack foundation ,forced filling of sand and quarry dust into foundation done.



Then basement rubble work with again dry pack with outside pointing and top plastering done.See pictures of Basement rubble work